Project Overview

The proposed 138 kilovolt (kV) transmission line project will begin at the existing Bryan Texas Utility (BTU) Steele Store Substation located on the northeast corner of State Highway 21 and Farm Road 50. The new transmission line will extend to the Lower Colorado River Authority Transmission Service Corporation’s Cooks Point Substation which is currently under construction and is located, about half a mile southeast of State Highway 21 on County Road 214. The final location of the project will depend on what route (or combinations of routing links) is approved by the Texas Public Utility Commission (PUC).