Client Logo

Construction Oversight
Weekly Report

POWER Engineers
Week of: 12/30/2018 - 1/5/2019

Inspectors:

Justin Toland, John Doe, Jane Doe

Projects:

Project Name: 100114, Project Name: 158638, Project Name: 130479

Field Supervision On Site:

Yes

Job Site Hours:

42

WEATHER EVENTS

Sun

Weather Icon

24°F

-2°F

Cloudy

Mon

Weather Icon

37°F

14°F

Thunderstorms

Tue

Weather Icon

30°F

9°F

Snow

Wed

Weather Icon

14°F

-21°F

Clear Day

Thu

Weather Icon

34°F

21°F

Hail

Fri

Weather Icon

32°F

18°F

Cloudy Day

Sat

Weather Icon

72°F

53°F

Tornado

SAFETY

Items to be included in this section:

  1. Incidents, first aids, near misses
  2. Safety meetings participated in and topic/ items covered
  3. Items coached on in the field
  4. Airsweb entries (example: “A positive observation with some coaching on checking the barricade each night before leaving the site to make sure the barricade is up and tagged. The tags need to be checked because the rain makes them wet and the wind will blow them off. Contractor bought some weather proof tags to put on the barricade. PASS ID 107828”)
  5. Reports reviewed (Wire Stringing assessments, lift plans, safety plans, traffic plans)
  6. Other safety issues, events, audits or issues encountered during the reporting period.

This section mainly populated by the safety specialist on site, but all field supervisors could have items to highlight.

CONSTRUCTION ACTIVITIES AND PROGRESS

Items to be included in this section:

  1. Work completed in the period
    1. (example: Sixteen bus support foundations installed, two switch support foundations, control house cabling for breakers X, Y, Z, TL structures 134, 135 and 135, Conductor and OPGW from structures 105-129, Breaker 25315, L-439 Line panel, RTU, 5 access points, 45 Mats on ROW near structures XX, etc.)
    2. List items started and completed ***Be specific and comprehensive.
  2. UNRESOLVED ISSUES OR ITEMS CRITICAL TO PROJECT PROGRESS (Information / Plans/ Answers/ risk assessments, etc)
PROJECT QUALITY

Items to be included in this section:

  1. Items inspected (Two switch support foundations, control house cabling for breakers X, Y, Z, TL structures 134, 135 and 135, Conductor and OPGW from structures 105-129, Breaker 25315, L-439 Line panel, RTU, 5 access points, 45 Mats on ROW near structures XX, etc.)
  2. Inspection reports completed (Commissioning book reports = breakers, switches, panels, etc) (Sag reports, grounding readings, phasing reports)
  3. Tests performed (Concrete break tests, compaction tests, breaker tests, switch piercing, relay tests, etc)
  4. Test results transmitted
CUSTOMER CONTACT, ISSUES, LANDOWNER ISSUES

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Enim nec dui nunc mattis enim. Volutpat odio facilisis mauris sit amet. Habitant morbi tristique senectus et netus et malesuada fames ac. Lacus suspendisse faucibus interdum posuere lorem ipsum. Neque volutpat ac tincidunt vitae semper quis lectus nulla. Laoreet suspendisse interdum consectetur libero. Non consectetur a erat nam at lectus urna duis convallis. Nulla malesuada pellentesque elit eget gravida cum sociis. Convallis a cras semper auctor. Habitant morbi tristique senectus et netus et malesuada. Consectetur adipiscing elit duis tristique sollicitudin nibh sit.

Lacinia quis vel eros donec. Imperdiet sed euismod nisi porta lorem mollis aliquam. Orci sagittis eu volutpat odio facilisis. At in tellus integer feugiat scelerisque. Mattis ullamcorper velit sed ullamcorper. Auctor eu augue ut lectus arcu bibendum at varius. Lacus suspendisse faucibus interdum posuere. Vulputate dignissim suspendisse in est ante. Pretium vulputate sapien nec sagittis aliquam malesuada bibendum arcu vitae. Lobortis elementum nibh tellus molestie nunc non blandit massa enim. Egestas egestas fringilla phasellus faucibus scelerisque eleifend donec pretium. Ornare quam viverra orci sagittis eu volutpat odio facilisis mauris. Lacus sed viverra tellus in hac habitasse platea dictumst. Quam id leo in vitae turpis massa sed elementum. Odio euismod lacinia at quis. Non pulvinar neque laoreet suspendisse interdum consectetur libero id. Odio aenean sed adipiscing diam donec adipiscing tristique. Tincidunt lobortis feugiat vivamus at augue eget arcu. Fusce id velit ut tortor pretium. Odio aenean sed adipiscing diam donec adipiscing tristique risus nec.

Sociis natoque penatibus et magnis dis parturient montes nascetur. Massa eget egestas purus viverra accumsan. Nunc id cursus metus aliquam eleifend mi in nulla. Et tortor consequat id porta nibh. Nisl pretium fusce id velit. Habitant morbi tristique senectus et. Amet mauris commodo quis imperdiet massa. Scelerisque viverra mauris in aliquam sem fringilla ut morbi tincidunt. Morbi enim nunc faucibus a pellentesque sit amet porttitor eget. Amet consectetur adipiscing elit ut aliquam purus.

UPCOMING CRITICAL TASKS

Items to be included in this section:

  1. Items in the next two weeks that are “critical” in nature:
    1. Tasks that require a safety focus (working near energized equipment, confined space, high risk elements)
    2. Wire stringing, highway, railroad, line crossings, etc.
    3. Critical lifts
    4. Critical path activities
    5. Relay testing (APS – abnormal protection schemes, customer impacts, radial feeds, etc)

TWO WEEK LOOK AHEAD

TASK/DESCRIPTION

DURATION/CREW

START DATE

DATE COMPLETED

Description 1

Crew 1

11/01/2019

11/02/2019

Description 2

Crew 2

11/02/2019

11/03/2019

Description 3

Crew 3

11/03/2019

11/04/2019

Description 4

Crew 4

11/04/2019

11/05/2019

Description 5

Crew 5

11/05/2019

11/06/2019

Description 6

Crew 6

11/06/2019

11/07/2019

CONSTRUCTION PHOTOS

DATE: 2018/01/11

DESCRIPTION: This is a discription of the photo.

 

DATE: 2018/01/11

DESCRIPTION: This is a discription of the photo.

 

DATE: 2018/01/11

DESCRIPTION: This is a discription of the photo.

DATE: 2018/01/11

DESCRIPTION: This is a discription of the photo.

 

DATE: 2018/01/11

DESCRIPTION: This is a discription of the photo.

 

DATE: 2018/01/11

DESCRIPTION: This is a discription of the photo.