SETEX Area Reliability Project

Scroll down

Online open house

Entergy Texas Inc. (ETI) has created this page to inform our customers about the upcoming project. All materials present at the in-person open house are posted below.



An additional open house will be held on Tuesday, June 18th from 4-7pm at the Polk County Commerce Center. Project Documents on the website are updated accordingly.

Interactive map

  • icon
  • icon
  • icon
  • icon
    • icon
    • icon
    • icon

    • icon
    • icon
    • icon
    • icon
    • icon
    • icon
  • icon
  • icon
  • icon
  • icon
    • icon
    • icon
    • icon

    • icon
    • icon
    • icon
    • icon
    • icon
    • icon

Only one route utilizing a forward progressing end-to-end combination of alternative segments will ultimately be selected and approved by the Public Utility Commission of Texas (PUCT) for construction. All routes and route segments included in the notice of the Certificate of Convenience and Necessity (CCN) application filing will be available for selection and approval by the PUCT.

Data layers such as parcel boundaries are obtained from third-party sources and may vary from the actual boundaries. Digitization of preliminary alternative segments and the approximate right-of-way is based on interpretation of these features and aerial photography. Once an alternative route is selected and approved by the PUCT, the represented centerline and approximate right-of-way is subject to modification based on ground surveys and detailed engineering design.

 

Open house map boards

These are the large map boards depicting the preliminary alternative segments in relation to environmental and land use constraints on topographic and aerial base that will be on display at the in-person open house. Click on the link to expand the board and download the pdf (high resolution) if desired.

Typical construction process

The graphics below are demonstrative examples of a typical construction scenario and configuration. Scenarios may vary by line segment.

Existing
Clearing
Foundations
Staging
Structure Lowering
Stringing
Line Complete
Restoration
Right-of-Way